Start with your property
Planning a granny flat in Sydney or greater NSW? Start with your block, preferred design and approval pathway. Work through the ten property checks and four practical tips below before committing to your project.

TEN CHECKS BEFORE APPLYING FOR GRANNY FLAT APPROVAL
Step 1. Property Size
Planning checklist: These checks are a starting point for a site assessment. They do not cover every requirement or confirm eligibility. Dimensions, setbacks, site constraints and approval timeframes must be checked against the current rules by your council or accredited certifier.
Is your property at least 450m²?
YES: Continue to Step 2 and check all applicable requirements.
NO: A secondary dwelling generally cannot use complying development on a smaller lot. NSW Planning identifies an exception where it is entirely within an existing dwelling house. An attached new structure does not by itself qualify for this exception. A council development application may still be possible, subject to assessment.
Step 2. Property Width
Does your lot meet the applicable width and access requirements?
For a lot other than a battle-axe lot, Schedule 1 measures the boundary with the primary road at the building line:
- 450m² to 900m² inclusive: at least 12m.
- More than 900m² to 1,500m² inclusive: at least 15m.
- More than 1,500m²: at least 18m.
For a battle-axe lot, the access laneway must be at least 3m wide and the lot must measure at least 12m by 12m excluding that laneway. A new secondary dwelling must have lawful access to a public road. These checks do not establish eligibility by themselves.
YES: Continue to Step 3 and check the remaining requirements.
NO: Ask us to assess an alternative design or a council development application. An attached granny flat does not automatically bypass the applicable complying-development standards.
Step 3. Maximum Floor Space (incl upstairs and garages, carports, awnings, patios and granny flat)
Will the proposal meet the floor-area and site-coverage limits?
The secondary dwelling is limited to 60m² excluding an attached ancillary structure, unless another environmental planning instrument permits a larger secondary dwelling on the land. Total floor area of the principal dwelling, secondary dwelling and qualifying attached ancillary structures must not exceed:
- 450m² to 600m² inclusive lot: 330m².
- More than 600m² to 900m² inclusive lot: 380m².
- More than 900m² lot: 430m².
Schedule 1 section 4 defines the floor-area measurement and which enclosed attached structures count. Site coverage is a separate calculation: no more than 50% for lots from 450m² to 900m² inclusive, 40% for lots over 900m² to 1,500m² inclusive, and 30% for lots over 1,500m². Section 3 specifies exclusions from that calculation.
YES: Continue to Step 4 and check the remaining requirements.
NO: Ask us to assess an alternative design or a council development application. An attached granny flat does not automatically bypass the applicable complying-development standards.
Step 4. Setbacks (distance to boundaries)
Can the design meet the applicable boundary setbacks?
Base side and rear setbacks under Schedule 1 are:
- 450m² to 900m² inclusive lot: side 0.9m; rear 3m.
- More than 900m² to 1,500m² inclusive lot: side 1.5m; rear 5m.
- More than 1,500m² lot: side 2.5m; rear 10m.
Greater building heights can increase these setbacks; see Step 5. Special rules and exceptions apply, including public reserves, some three-boundary lots and structures. Setbacks are measured from the building line at its closest point to the boundary.
For a primary road that is not classified, the front setback uses the average of the two nearest dwelling houses on the same side within 40m, subject to Schedule 1 calculation rules. If there are not two qualifying houses, the minimum is 4.5m for lots from 450m² to 900m² inclusive, 6.5m for lots over 900m² to 1,500m² inclusive, and 10m for larger lots. Parallel-road, corner-lot and classified-road boundaries have separate standards.
A rear-laneway building line may abut the boundary for up to 50% of its length; this is not a blanket zero-setback permission. Building-to-building fire separation must also be assessed under the applicable building requirements, rather than assumed from a single separation distance.
YES: Continue to Step 5 and check the remaining requirements.
NO: Ask us to assess an alternative design or a council development application. An attached granny flat does not automatically bypass the applicable complying-development standards.
Step 5. Maximum Height
Can your design meet both the height limit and the height-related setbacks?
Schedule 1 limits a new secondary-dwelling building or new part of an existing building to 8.5m above ground level (existing). A 3.8m height is a setback trigger, not the maximum permitted height. Outbuildings and fences have separate height limits.
For the structures covered by section 9(2)–(3), add 25% of the height above 3.8m to the applicable base side setback. The base depends on lot size; it is not always 0.9m.
Where section 10 applies, rear setbacks increase by three times the height above 3.8m. The resulting rear setback is capped at 8m for lots from 450m² to 900m² inclusive, 12m for lots over 900m² to 1,500m² inclusive, and 15m for larger lots. Check the applicable exceptions and use the maximum building height when calculating side or rear setbacks on a sloping lot.
YES: Continue to Step 6 and check the remaining requirements.
NO: Ask us to assess an alternative design or a council development application. An attached granny flat does not automatically bypass the applicable complying-development standards.
Step 6. Landscaping
Will the lot retain the required landscaped area?
Schedule 1 requires at least:
- 20% for a lot from 450m² to 600m² inclusive.
- 25% for a lot over 600m² to 900m² inclusive.
- 35% for a lot over 900m² to 1,500m² inclusive.
- 45% for a lot over 1,500m².
At least 50% of the landscaped area must be behind the building line to the primary road boundary. Its minimum dimensions must be more than 2.5m. This is not simply a requirement for a fixed percentage behind the existing house.
YES: Continue to Step 7 and check the remaining requirements.
NO: Ask us to assess an alternative design or a council development application. An attached granny flat does not automatically bypass the applicable complying-development standards.
Step 7. Principle Private Open Space (P.P.O.S.)
Can the lot provide the required principal private open space?
Schedule 1 requires more than 24m² of principal private open space. It must be directly accessible from and adjacent to a habitable room other than a bedroom, more than 4m wide, and no steeper than a 1:50 gradient. The space may be shared by the principal dwelling and secondary dwelling and may be a balcony or deck.
YES: Continue to Step 8 and check the remaining requirements.
NO: Ask us to assess an alternative design or a council development application. An attached granny flat does not automatically bypass the applicable complying-development standards.
Step 8. Maximum Excavation
Can the proposed excavation, fill and structural support meet the applicable requirements?
Maximum excavation depth, measured from ground level (existing), is:
- No more than 1m from any boundary: 1m deep.
- More than 1m but no more than 1.5m from any boundary: 2m deep.
- More than 1.5m from any boundary: 3m deep.
A 1m excavation limit applies on land identified as Class 3 or 4 on an Acid Sulfate Soils Map or within 40m of a natural waterbody. Fill has separate limits: generally 1m for a secondary dwelling and 600mm for an ancillary structure, with a specified exception for fill wholly within the structure footprint. Fill above 150mm outside the footprint is also limited to 50% of the landscaped area. Finished fill level cannot be used to increase the permitted building-height measurement.
Earthworks more than 600mm above or below existing ground require retaining walls or structural support meeting the engineering, drainage and other requirements in Schedule 1 section 18. Have the full earthworks design assessed; the depth list alone is not a cut-and-fill approval test.
YES: Continue to Step 9 and check the remaining requirements.
NO: Ask us to assess an alternative design or a council development application. An attached granny flat does not automatically bypass the applicable complying-development standards.
Step 9. Stormwater Drainage Requirement
Can a suitable stormwater system be designed and approved for the site?
Schedule 1 requires stormwater from the development to be conveyed by a gravity-fed or charged system to a public drainage system, an inter-allotment drainage system or an on-site disposal system. The system and connection require approval under Local Government Act section 68 where applicable; otherwise they must comply with the relevant council development control plan requirements. An on-site system is not automatically feasible, and a rubble pit is not the only form specified by the policy.
YES: Continue to Step 10; the proposed drainage solution must be assessed for your site.
NO: Obtain advice on a suitable stormwater design and approval pathway before proceeding.
Step 10. Distance to Tree-Trunks
Have protected trees and the applicable tree setbacks been checked?
Schedule 1 generally requires the secondary dwelling, ancillary structures and associated excavation to be at least 3m from a protected tree on the lot. A protected tree is defined by whether pruning or removal needs a separate permit or development consent, subject to the policy exception; it is not defined here by being native or taller than 4m or 5m.
Specified ancillary structures can be within this setback where cut or fill does not exceed 0.15m. Separate permission may be required to prune or remove protected-tree branches or roots on the lot or adjoining land. Check the council tree controls and the full section 20 requirements before positioning the building.
YES: Completing this checklist is a starting point, not confirmation of eligibility or approval. A council or accredited certifier must assess all applicable requirements.
NO: Seek advice on tree protection, design changes and any required tree-removal approval before proceeding.
Calculate your Approval Price HERE
You can also Contact us on 1300 205 007 to begin your Approval Process
4x Tips for Investors when looking for a 'Granny Flat Friendly Property'
Planning rules checked against the current Housing SEPP and Schedule 1 on 6 October 2026. This is a starting checklist; a council or accredited certifier must assess the complete proposal.
1. Check the Contract
(A) Review the Section 10.7 planning certificate and relevant site constraints with your council or certifier. Eligibility also depends on the proposed design and all applicable standards. Flood, bushfire and heritage constraints can restrict complying development, but a flood-control lot is not automatically excluded: the Housing SEPP specifies restricted areas and additional assessment requirements. Do not treat this checklist or the certificate alone as approval.
(B) Obtain the relevant Sydney Water diagrams and check the location of wastewater pipes and other assets before positioning the granny flat. A sewer near the rear boundary is not automatically clear of the proposed work. Building close to or over Sydney Water assets requires assessment through its building plan approval process; asset protection or design changes may be required.
(C) Look at the ‘Deposited Plan’. This is a sketch which shows the property, usually in relation to other properties around it, the boundary dimensions, the block’s size plus drainage easements (if any).
2. Check Slope and Drainage
Check the land levels, existing drainage and registered easements before positioning the granny flat. A fall towards the rear can affect the available stormwater solution. An existing easement does not automatically establish permission or capacity to connect, and on-site disposal is not suitable for every property. Have a site-specific system assessed against the relevant approval and council requirements.
3. Check Protected Trees
Check which trees require permission for pruning or removal before designing the granny flat. Schedule 1 generally requires a 3m setback from a protected tree on the lot for the secondary dwelling, ancillary structures and associated excavation, with specified ancillary exceptions. Protection is not determined by a single tree-height threshold. Work affecting protected branches or roots on adjoining land may also require separate permission.
4. Parking and Access
The Housing SEPP does not require additional parking for a secondary dwelling. Check the requirements of any existing development consent, and discuss the removal of existing on-site parking with council. Consider practical access and parking needs when planning your project.
Your proposal must meet the applicable requirements of the Housing SEPP secondary-dwelling provisions, along with other relevant planning and building requirements. We can help assess the design and approval work for your property.
Contact us on 1300 205 007 to begin your Approval Process.
Warm Regards,
Serge Panayi- Granny Flats Sydney
Plan your next step
Compare granny flat designs and floor plans, explore completed projects across Sydney and Wollongong, or use our approval pricing calculator to plan your design and approval budget. Building prices are available separately in our building price calculator.
Meet Serge Panayi and learn about our approach, or discuss your property with us.